Extrusion Production Line Management

Extrusion production line management Extrusion production line management Effective management of the extrusion line requires a sufficient number of operators, as well as the original Procurement and product sales staff. The number of operators and the skill level by the production process and five If the production process is highly automated, the...

Extrusion production line management
Extrusion production line management
Effective management of the extrusion line requires a sufficient number of operators, as well as the original
Procurement and product sales staff. The number of operators and the skill level by the production process and five
If the production process is highly automated, the pneumatic conveying system is used for center feeding,
Product collection, and product size and quality online feedback control, the number of operators can be "
Reduced. One person can operate two to three film production line or pipe production line. At this time, t
The main function of the work is to monitor the operation of automatic equipment. In some cases, operate
Also act as inspector's role. The technical level of such operators is very demanding
To understand the processing technology, and after a good specialized training.

Non-automatic production line, but also sweet to raw materials processing and feeding personnel, as well as handling
Work - send the product to the warehouse.
In the manual production line, the operator needs to close, continuous attention to prevent waste
And other problems. Therefore, semi-automatic production line also need to be equipped with a certain number
Production and maintenance personnel. It should also be noted that as far as possible to avoid waste and waste rods cut bamboo shoots, which is determined by the waste to come
Floating, modify the operation steps to correct the control system and complete. Usually in the production line just started
Will produce more waste. After the start of processing, to achieve a stable extrusion will take some time
In the device
Part of the product failed to return to processing.
If a computer or other closed-loop control system is used, the startup data can be stored in the control
, So as to prepare for the smooth start of the corresponding plan. By determining the size of the greatest impact
Of the process parameters, and carefully monitored to determine the start sequence, so that the extrudate
Size can reach a predetermined value as soon as possible. In this way, through the information on-line monitoring and control
system,
positive,
Occasionally
Can be developed to the corresponding control steps, and the production line can also be fast on the size of the school
And make it work properly.
It is also one of the most important responsibilities for skilled operators to dispose of waste. real
, The amount of waste t is to determine the processing efficiency of a decisive factor.
For the production of high extrusion line, take 24 h continuous operation of the way
A workshop of all employees can be arranged as follows: the operator is responsible for one or more extruder Zhu
Production control, workshop support personnel are usually skilled operation I, negative guide work
The person in charge of the workshop is responsible for the production of the entire workshop, including the adjustment of the production line and the number
Change and so on. Quality inspectors are usually responsible for quality control and report the results. Engraved call
Engineering and technical personnel, responsible for the maintenance and repair of production equipment. Workshop main flat throw two extravagant
The management is usually responsible for supervising the center control system of the workshop and reporting to the regular production report
Use the love.

Source: www.handern.net